About The Position

The Site Leader will provide world-class jobsite leadership for large, long-duration, high-profile projects for Vertiv power and/or thermal equipment. The Site Leader is the primary Vertiv Service on-site technical representative for large jobs, from construction start, through start-up, site acceptance testing, and project completion. The Site Leader is required to establish, grow and maintain excellent rapport with all customers, co-workers, sales representatives and others as appropriate. The Site Lead is required to work in tandem with the assigned Project Manager to drive cost controls, schedule adherence, resource management, and ultimately a positive customer experience.

Requirements

  • ASEET or ASMET preferred
  • Equivalent industry experience, specifically leading and actively participating in start-up and commissioning of power and/or hvac equipment preferred
  • Six years military experience in a related field
  • Minimum 2 years of experience in Industrial construction management
  • Vertiv Behavior practitioner
  • Strong organizational skills
  • Independent operator
  • Strong verbal and written communication skills
  • Able to build and maintain trusting customer relationships
  • Collaborative and cooperative in high-stress environments
  • Able to communicate at all levels of an organization with a base level of executive presence
  • Able to quickly respond to changing customer priorities without disruption or resistance
  • Must be able to read and interpret electrical one-line diagrams and blueprints
  • In all aspects of the job, need to lead by example, and held to a higher standard of conduct
  • Product certifications up to date
  • Meet all aspects of the job description
  • Performance evaluation rating of meets all aspects of job requirement or better
  • Consistent performance and customer relation skills
  • Ability to make an immediate site evaluation, skills to include: environmental temperature, and general operating conditions without supervision
  • Ability to summarize and report all work related tasks performed
  • Independently evaluate, recognize and recommend acceptable customer solutions based upon site evaluation
  • Recommend and direct activities at a customer site by leading technical activities of other technicians
  • Provide on-site customer consultation with the assistance of Project Leader(s)
  • Capable of providing project leadership and on-site direction for assigned projects
  • Expert in COHE procedures
  • Expert in site acceptance testing procedures and equipment
  • Advanced word processing, report generation
  • Spreadsheet processing
  • Electronic mail
  • Test equipment and data analysis programs
  • Familiarity with computer networks
  • Mechanical aptitude
  • Valid driver’s license
  • Deployable in the event of emergencies
  • Must be able to consistently lift up to 50 pounds and occasionally up to 75 pounds.

Nice To Haves

  • ASEET or ASMET preferred
  • Equivalent industry experience, specifically leading and actively participating in start-up and commissioning of power and/or hvac equipment preferred
  • Six years military experience in a related field

Responsibilities

  • Provide jobsite construction and technical leadership for large projects
  • Working knowledge of critical infrastructure equipment in data centers, including Vertiv-manufactured equipment
  • Leads a multi-disciplinary on-site team consisting of Project Leaders, Installers, Technicians, Customer Engineers, and subcontractors
  • Represents Vertiv at daily customer meetings and can speak to technical requirements for the day’s schedule to coordinate activity with other parties on-site
  • Leads and supports start-up and site testing activities for assigned projects
  • Ensure sufficient manpower on-site each day to perform start-up and site testing work
  • Assist during start-up and site testing as necessary, depending upon manpower availability and site location
  • Provide daily status reports to Service Management, Project Management and sales rep
  • Keeps current on Vertiv equipment start-up and commissioning processes, procedures, and tools-of-the-trade
  • Keeps current on Safety Bulletins, Safety Field Change Notices, Field Change Notices, and Service Tips
  • Leads daily Vertiv toolbox talk, pre-job safety walk and inspection, and drives any necessary corrective/preventative actions required in a timely fashion
  • Responsible for the adherence and administration of all site and Vertiv Safety policies on job sites
  • Operates in a safe manner in accordance with published safety guidelines
  • Must wear appropriate PPE as per company guidelines and accordance with job duties
  • Adhere to work hours policy guidelines – “14 hours rule”
  • Report all work related accidents or injuries within 24 hours to the appropriate personnel
  • Must be a role model to fellow associates with regards to safety by setting a positive example
  • Lead by example with the use of STOP WORK Authority, Good Catch engagement, and timely closure of necessary corrective/preventative actions
  • Ensure adherence to Vertiv Warranty process in partnership with Project Manager
  • Provide accurate and timely reporting in accordance with published guidelines (Timecards, expense reports, mileage reports, SR/task closure, forms, et al.)
  • Supports Project Manager with obtaining any necessary technical data so Project Manager can maintain project systems
  • Maintain company property according to company policies (Credit cards, PPE, test equipment, laptop, smartphone, et al.)
  • Provide proper and adequate communication to internal and external customers
  • Ensure daily alignment of customer expectations and Vertiv activity, and drive clarification/re-alignment if there appears to be misalignment of expectations
  • Maintain customer satisfaction rates according to company guidelines
  • Make decisions based on the Fundamental 5 in order of importance: Safety, Quality, Timeliness, Cost, Productivity
  • Capable of making timely decisions, technical and commercial, under pressure
  • Maintain productive utilization rate according to company guidelines
  • Adhere to company dress code and safety regulations
  • Understand and comply with company startup/escalation process and procedures
  • In all aspects of job requirements, must lead by example, and conduct themselves aligned to Vertiv Behaviors
  • Ability to communicate with all levels within the organization - Managers, co-workers, Support Services, sales, electronic communications, et al.
  • Ability to handle stressful situations and provide a calming effect to customer
  • High level of diplomacy when interacting with internal and external customers

Benefits

  • Vertiv will make reasonable accommodations whenever necessary for all qualified employees or candidates with disabilities (as defined by applicable law), provided that (1) the individual is otherwise qualified to safely perform the essential functions of the job and (2) such accommodations do not impose an undue hardship.
  • Candidates are required to successfully pass a drug test prior to employment.
  • Candidates are required to complete and pass a pre-employment background check.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service