The Set Up II (PMT) is responsible for end-to-end changeovers, technical configuration, process stabilization, and basic troubleshooting of plastic injection molding machines and related auxiliary equipment. The role retrieves and installs molds across a range of press tonnages, synchronizes auxiliary automation, and adjusts process parameters such as temperatures, pressures, and cycle times to achieve first-piece approval and efficient production runs. The position also involves connecting and verifying mechanical, hydraulic, pneumatic, cooling-water, and electrical interfaces; configuring auxiliary equipment; handling resins and other process materials; and using machine recipes and setup documentation to adjust molding parameters. The Set Up II troubleshoots product defects, coordinates initial part inspections with Quality Assurance/QPA, and follows safety, preventive maintenance, TPM, 5S, and WCM practices. The role provides intermittent setup guidance and standard operating training to machine operators.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
High school or GED