Senior Construction Scheduler (Scheduler III)

Tutor Perini Corporation•San Jose, CA
•$170,000 - $210,000

About The Position

Rudolph & Sletten, a Tutor Perini Company, is seeking a Scheduler III – Healthcare to join its Project Controls team in the San Francisco / San Jose Bay Area. This senior, client-facing role leads CPM scheduling on complex healthcare projects, owning schedules from baseline through closeout for OSHPD projects. Work includes new acute care facilities, phased renovations of occupied hospitals, and seismic compliance projects. The scheduler works directly with owners, owner’s representatives, design teams, and OSHPD-related stakeholders, and mentors junior schedulers. The role develops resource- and cost-loaded Primavera P6 baseline schedules that meet contract requirements, structures schedules for multi-phase healthcare projects, and secures owner and reviewer acceptance. It manages schedule updates, progress status, narratives, critical-path and float analysis, and schedule quality checks, while also preparing schedules for pursuits, preconstruction, and proposals. The scheduler plans OSHPD reviews and approvals, inspections, testing, and the steps leading to final sign-off, licensing, and occupancy. The role also coordinates work in operating hospitals, including infection-control requirements, phasing, utility shutdowns, swing space, and facility operations. It facilitates pull-planning and phase-scheduling with trade partners and design teams, integrating collaborative plans into the master CPM schedule and supporting the Last Planner cycle. The position identifies schedule risks and delays, develops mitigation and recovery plans, prepares and defends time impact analyses and fragnets, and supports time-extension negotiations and claim resolution. It serves as the scheduling point of contact for project stakeholders, reports schedule status and risks to leadership, mentors Scheduler I/II staff, and contributes to company scheduling standards.

Requirements

  • Bachelor’s degree in construction management, engineering, architecture, or a related field, or equivalent experience.
  • At least 7 years of CPM construction scheduling experience.
  • At least 3 years or 2 completed projects on OSHPD healthcare work.
  • Expert-level Primavera P6 skills, including baseline development, updates, resource and cost loading, and schedule analysis.
  • Hands-on experience facilitating Last Planner System and pull-planning sessions and integrating collaborative plans into CPM schedules.
  • Demonstrated experience preparing time impact analyses and delay analyses and presenting or defending them to owners.
  • Strong written and verbal communication skills, including schedule narratives and executive-level reporting.
  • Working knowledge of the OSHPD review, inspection, and approval process and its impact on healthcare project schedules.

Nice To Haves

  • OSHPD 1 acute care hospital experience.
  • Experience with phased renovations in occupied acute care facilities and hospital seismic compliance projects.
  • Familiarity with Oracle Primavera Cloud, MS Project, and schedule analysis tools such as Acumen Fuse.
  • Lean construction training or credentials, such as LCI Last Planner training or AGC CM-Lean.
  • Experience in IPD, design-assist, or design-build healthcare projects.
  • AACE PSP or PMI-SP certification.

Responsibilities

  • Lead CPM scheduling on complex healthcare projects, owning schedules from baseline through closeout on OSHPD projects.
  • Develop resource- and cost-loaded Primavera P6 baseline schedules that meet contract scheduling specifications and obtain acceptance from owners and reviewers.
  • Set up WBS, activity coding, calendars, and phasing for multi-phase healthcare projects.
  • Run monthly schedule updates, progress statusing, narratives, critical-path and float analysis, and schedule quality checks, including the DCMA 14-point assessment.
  • Prepare schedules for pursuits, preconstruction, and proposals as needed.
  • Schedule OSHPD review and approval durations, inspections, field reviews, testing, and inspection activities through final sign-off, licensing, and occupancy.
  • Plan work in occupied hospitals, coordinating infection-control requirements, phasing, utility shutdowns, swing space, and facility operations.
  • Facilitate pull-planning and phase-scheduling sessions with trade partners and design teams, and integrate outcomes into the master CPM schedule.
  • Support the Last Planner cycle, including milestone and phase planning, make-ready lookahead and constraint logs, weekly work plans, PPC tracking, and variance and root-cause analysis.
  • Identify schedule risks and potential delays early and develop mitigation and recovery strategies, including recovery and what-if schedules.
  • Prepare and defend time impact analyses and fragnets for changes, owner-caused delays, and unforeseen conditions; conduct delay and acceleration analyses consistent with AACE recommended practices.
  • Support negotiation of time extensions and resolution of claims.
  • Serve as scheduling point of contact for owners, owner’s representatives, and design teams; present schedule status and risks to project and company leadership.
  • Mentor and review the work of Scheduler I/II staff and contribute to company scheduling standards.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service