Senior Construction Scheduler (Scheduler III)

Tutor Perini•San Francisco, CA

About The Position

Rudolph & Sletten, a Tutor Perini Company, is seeking a Senior Construction Scheduler to join its Project Controls team in the San Francisco / San Jose Bay Area. This senior, client-facing role leads CPM scheduling on complex healthcare projects, owning schedules from baseline through closeout. Projects include OSHPD work such as new acute care facilities, phased renovations of occupied hospitals, and seismic compliance work. The scheduler works directly with owners, owner’s representatives, design teams, and OSHPD-related stakeholders, and mentors junior schedulers. The role develops resource- and cost-loaded Primavera P6 baseline schedules that meet contract requirements, including WBS, activity coding, calendars, and phasing for multi-phase healthcare projects. It runs schedule updates and analysis, supports pursuits and preconstruction, incorporates OSHPD review and approval activities, and plans work in operating hospitals with attention to infection control, phasing, utility shutdowns, swing space, and facility operations. The scheduler facilitates collaborative pull-planning and phase-scheduling, integrates plans into the master CPM schedule, and supports the Last Planner cycle. The role identifies schedule risks, develops mitigation and recovery strategies, prepares and defends time impact and delay analyses, supports time-extension negotiations and claims resolution, communicates schedule status and risk to stakeholders and leadership, and contributes to company scheduling standards.

Requirements

  • Bachelor’s degree in construction management, engineering, architecture, or a related field, or equivalent experience.
  • At least 7 years of CPM construction scheduling experience.
  • At least 3 years or 2 completed projects on OSHPD healthcare work.
  • Expert-level Primavera P6 skills, including baseline development, updates, resource/cost loading, and schedule analysis.
  • Hands-on experience facilitating Last Planner System and pull-planning sessions and integrating collaborative plans into CPM schedules.
  • Demonstrated experience preparing time impact analyses and delay analyses and presenting or defending them to owners.
  • Strong written and verbal communication skills, including schedule narratives and executive-level reporting.
  • Working knowledge of the OSHPD review, inspection, and approval process and its impact on healthcare project schedules.

Nice To Haves

  • OSHPD 1 acute care hospital experience.
  • Experience with phased renovations in occupied acute care facilities and hospital seismic compliance projects.
  • Familiarity with Oracle Primavera Cloud, MS Project, and schedule analysis tools such as Acumen Fuse.
  • Lean construction training or credentials, such as LCI Last Planner training or AGC CM-Lean.
  • Experience in IPD, design-assist, or design-build healthcare projects.
  • AACE PSP or PMI-SP certification.

Responsibilities

  • Lead CPM scheduling on complex healthcare projects from baseline through closeout.
  • Develop resource- and cost-loaded Primavera P6 baseline schedules that meet contract scheduling specifications.
  • Set up WBS, activity coding, calendars, and phasing for multi-phase healthcare projects and obtain acceptance from owners and reviewers.
  • Run monthly schedule updates, progress statusing, narratives, critical path and float analysis, and schedule quality checks such as the DCMA 14-point assessment.
  • Produce schedules for pursuits, preconstruction, and proposals as needed.
  • Incorporate OSHPD review and approval durations, including plan review, increments, deferred submittals, amended construction documents, and change orders.
  • Schedule IOR inspections, OSHPD field reviews, testing and inspection, and steps leading to final sign-off, licensing, and occupancy.
  • Plan work in occupied, operating hospitals, addressing ICRA/infection-control requirements, phasing, utility shutdowns, swing space, and coordination with facility operations.
  • Facilitate pull-planning and phase-scheduling sessions with trade partners and design teams, and integrate the results into the master CPM schedule.
  • Support the Last Planner cycle, including milestone and phase planning, make-ready lookahead and constraint logs, weekly work plans, PPC tracking, and variance and root-cause analysis.
  • Identify schedule risks and potential delays early and develop mitigation and recovery strategies with the project team.
  • Prepare recovery and what-if schedules.
  • Prepare and defend time impact analyses and fragnets for changes, owner-caused delays, and unforeseen conditions.
  • Perform delay and acceleration analyses consistent with AACE recommended practices and support time-extension negotiations and claims resolution.
  • Serve as the scheduling point of contact for owners, owner’s representatives, and design teams.
  • Present schedule status and risk to project and company leadership.
  • Mentor and review the work of Scheduler I/II staff and contribute to company scheduling standards.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service