The Production Planner is a new and critical capability within the Cambridge facility, responsible for translating the Master Production Schedule (MPS) into detailed, executable four-week rolling and daily production plans for the Production and Quality teams. This role ensures that work is sequenced correctly by operation, that cycle times defined in process sheets drive realistic scheduling, and that the right resources, materials, and capacity are aligned to meet customer commitments. The Production Planner is a key link between planning intent and shop floor execution within the Mirion Factory Development System (MFDS). This position fills an existing vacancy.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level