Mechanical Assembler - 1st Shift

GE VernovaCharleroi, PA
Onsite

About The Position

Assemble electrical subassemblies of the products, following the letter of manufacture (CF), drawings and superior orientations, executing the manufacture of the primary and isolation of the TCs (Current Transformers). Assist in the accomplishment of the activities related to the assembly of equipment, following letter of manufacture, drawings and superior orientations. Make interpretation of isolation plans and work instructions. Perform the isolation of the TCs to oil, following norms and letters of manufacture, coating the ferrule and low voltage tube with insulation papers. Perform the manufacture of the primary TC, following norms and letter of manufacture, cutting copper strips, laying them one on top of the other, coating them with insulating material, welding the posts and effecting the number of turns according to the manufacturing chart. Conduct the preparation of OSKF insulation material by bonding according to process standards. Make use of measuring instruments to accompany the dimensional throughout the insulation process.

Requirements

  • Ability to interpret isolation plans and work instructions.
  • Knowledge of norms and letters of manufacture for TC isolation and primary TC manufacture.
  • Proficiency in using measuring instruments.

Responsibilities

  • Assemble electrical subassemblies of the products, following the letter of manufacture (CF), drawings and superior orientations.
  • Execute the manufacture of the primary and isolation of the TCs (Current Transformers).
  • Assist in the accomplishment of the activities related to the assembly of equipment, following letter of manufacture, drawings and superior orientations.
  • Make interpretation of isolation plans and work instructions.
  • Perform the isolation of the TCs to oil, following norms and letters of manufacture, coating the ferrule and low voltage tube with insulation papers.
  • Perform the manufacture of the primary TC, following norms and letter of manufacture, cutting copper strips, laying them one on top of the other, coating them with insulating material, welding the posts and effecting the number of turns according to the manufacturing chart.
  • Conduct the preparation of OSKF insulation material by bonding according to process standards.
  • Make use of measuring instruments to accompany the dimensional throughout the insulation process.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service