Field Engineer

M.C. Dean, IncRock Hill, SC
Onsite

About The Position

The Field Engineer will provide technical & administrative information to others working on a project to ensure that the work complies with all basic engineering standards, codes, specifications, and design instructions; troubleshoots engineering related installation problems. Works closely supervised and solves problems of limited scope and complexity.

Requirements

  • High School Diploma / GED with 6+ years of experience.
  • Ability to lift, carry, and move objects weighing up to [50 pounds] on a regular basis.
  • Demonstrate physical strength and stamina to perform various tasks, including but not limited to, loading, and unloading, operating equipment, and assisting in the transportation of various materials.
  • Proper lifting techniques and safety protocols must be followed to ensure personal and team safety.
  • Relocates a 12 foot stepladder without assistance.
  • Works at various heights up to 60 feet and can climb and maintain balance on scaffolds, aerial lifts, catwalks and all types of ladders.
  • Walks, climbs, lifts, squats, crawls, kneels, pushes, pulls and reaches overhead on a routine and repetitive basis.
  • Possess good vision (may be corrected vision), the ability to see in color, and the ability to hear and communicate in English.
  • May use a standard ladder without exceeding the weight limit while carrying tools.
  • Tell when something is wrong or is likely to go wrong. It does not involve solving the problem, only recognizing there is a problem.
  • Apply general rules to specific problems to produce answers that make sense.
  • Combine pieces of information to form general rules or conclusions (including finding a relationship among seemingly unrelated events).
  • See details at close range (within a few feet of the observer).
  • Listen to and understand information and ideas presented through spoken words and sentences.

Responsibilities

  • Document field progress in JobConnect
  • Based on active communication and coordination with the Project Superintendent, document 3 week look aheads for field leaders
  • Coordinate with foreman and communicate look aheads with dates. Identify, document, and communicate work constraints that hinder reaching milestone dates.
  • Create weekly and monthly Field Impact Logs to communicate predecessor activities to the Project Leadership Team
  • Perform Quality Assurance function (i.e. ensure that the field leads are filling out their QC check-lists)
  • Working in JobConnect (MC Dean’s construction management platform) and updating forms to include testing and commissioning forms.
  • Attend daily ORM’s and document ORM board in JobConnect.
  • Document field issues on behalf of foreman and communicate those issues back to the APL/PL/Project Engineers
  • Attend weekly GC pull planning / last planner meetings and document the results of the meeting.
  • Track down RFI responses and hand deliver them to foremen.
  • Updating the drawings to incorporate RFI’s and create conformed record sets of drawings based on RFI responses.
  • Perform as-built documentation on behalf of the foremen in Bluebeam.
  • Walk the field once a week with foreman and drawings and identify changes or differences from shop drawings to field installs. Transfer these changes to electronic documents.
  • Keep running punch list based on information above and document “loose ends” for field team to complete.
  • Coordinate with general contractor’s “field engineers” and communicate this information back to team and GC.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service