Fermi America is seeking a Data Center Construction Manager to serve as Fermi’s daily field presence overseeing the design-build partner responsible for delivering its data center buildings. Under a lump-sum turnkey delivery model, the partner provides design, construction labor, superintendents, and field engineering. Fermi’s role in the field is not to direct that work. It is to verify what is being built and reported—and to remove owner-side obstacles quickly enough that the partner has no basis to claim Fermi caused delays. Two primary exposures define this position. The first is owner-caused delay. Because the partner controls both design and construction, its strongest claim path is that Fermi was unresponsive. Every access request, field decision, or interference left unresolved can become a source of entitlement. The second is progress-based payment. This role walks the work and confirms that invoiced work is installed, complete, and accurate in quantity. The boundaries between this position and adjacent roles are deliberate: The Director of DC Construction owns the contract and the commercial position with the partner. The DC Senior Technical Specialist owns technical conformance with Fermi’s basis of design. DC QA/QC and Commissioning owns the quality process and commissioning authority. The Data Center Construction Manager owns field reality: what is physically happening on site, whether it aligns with the schedule and pay application, and the conditions present while the work occurs. This role reports to the Director of DC Construction and works daily with the design-build partner’s construction leadership. It also works closely with the DC Senior Technical Specialist, DC QA/QC and Commissioning, the DC Scheduler, project controls, safety, and the campus power and connectivity teams. When a DC Project Manager is assigned to a tenant account, this role takes day-to-day field priorities from that Project Manager while continuing to report to the Director of DC Construction. Verification of work in place, progress reporting, and maintenance of the field record remain independent of the Project Manager’s reported cost and schedule position. This is a full-time, on-site position.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior
Education Level
High school or GED