Site Integrated Planner

Computer Task Group, IncGlendale, AZ
Onsite

About The Position

The Site Integrated Planner is responsible for integrating Production Planning (PP), Material Requirements Planning (MRP), and Distribution Requirements Planning (DRP) to develop an optimized, executable supply plan. This role ensures alignment between customer demand, inventory targets, material availability, and production capacity to support high service levels and efficient operations.

Requirements

  • 2+ years in production planning, supply planning, or materials planning
  • Experience with ERP/MRP systems (SAP or similar preferred)
  • Strong analytical, quantitative, and problem-solving skills
  • Knowledge of supply chain planning concepts (capacity, inventory, demand)
  • Experience working cross-functionally in manufacturing environments
  • Strong communication, attention to detail, and ownership mindset
  • Must be able to commute and work onsite in Glendale, AZ
  • Must be able to work on a W2 Tax basis (no C2C or third-party vendors)

Responsibilities

  • Develop and maintain a 13-week rolling, SKU-level production plan
  • Balance demand, capacity, inventory, and material availability
  • Manage production planning parameters (lot sizes, yields, safety stock)
  • Integrate new product introductions into production schedules
  • Collaborate with manufacturing, logistics, finance, and planning teams
  • Generate material requirements and manage purchase requisitions/POs
  • Maintain accurate BOMs and planning parameters (lead times, MOQ, safety stock)
  • Identify and resolve material shortages or excess inventory risks
  • Partner with procurement and suppliers to ensure material availability
  • Develop and maintain replenishment plans across distribution locations
  • Balance inventory across the network to reduce stockouts and excess
  • Manage stock transfer orders (STOs) and shipment execution
  • Monitor in-transit and on-hand inventory across all nodes
  • Analyze 13-week supply plans for risks, gaps, and bottlenecks
  • Track KPIs including OTIF, service levels, MPS adherence, and inventory targets
  • Perform root cause analysis and support corrective actions
  • Use ERP/MRP systems for planning, analysis, and execution
  • Support process improvements, automation, and digital planning initiatives
  • Contribute to SIOP / integrated planning processes
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service