TPZP, a Tutor Perini joint venture company, is the company selected to execute the California High Speed Rail – construction package one (CP-1). TPZP is seeking a Project Closeout Manager for the project in Fresno, CA. About California High Speed Rail- CP1 Extraordinary Projects, Exceptional Performance The California High-Speed Rail Authority’s Construction Package 1 (CP1) is the first significant construction contract executed on the Initial Operating Section of the High-Speed Rail project in California’s Central Valley. The CP1 construction area is a 32-mile stretch between Avenue 19 in Madera County to East American Avenue in Fresno County, including major work elements in downtown Fresno. It includes 12 roadway / railroad grade separations, two mainline viaducts, one tunnel, realignments of existing railroad tracks, utility relocations, roadway relocations, two trench sections, and a major river crossing over the San Joaquin River. Extraordinary Projects Need Exceptional Talent
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior
Education Level
High school or GED