The Production Scheduler controls floor execution for an assigned manufacturing area within MDO Integrated Planning. The role owns the short-term production horizon by deciding what work is released to the floor, in what sequence, and whether material and floor conditions are ready. The scheduler monitors work in process (WIP), identifies stalled or at-risk orders, coordinates daily priorities with supervisors, and keeps work moving on schedule. The MRP Planner provides a workable plan; the Production Scheduler owns sequencing, release decisions, and production-order replanning when execution diverges from that plan. Floor-level capacity conflicts are resolved within the assigned area, while cross-program conflicts are escalated to the MDO Planning Lead. The role coordinates closely with the MRP Planner, Material Control, program coordination, shop supervisors, and the production floor.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
High school or GED