PRODUCTION PLANNER 2

Huntington IngallsNewport News, VA
Onsite

About The Position

Plans sequence of fabrication, assembly, installation, and other manufacturing operations relating to specific portion of the product for guidance of production workers. Plans detail operations from blueprints, engineering orders, change notices, and other engineering releases. Determines the need for tooling and makes recommendations for the design and planning of required tools. Prepares shop work orders for materials and product processing and coordinates with schedulers to ensure that items are being processed according to specifications and time requirements. Maintains progress reports, schedules, and other related records.

Requirements

  • Associate's Degree and 1 years of relevant experience
  • NNS Apprentice School graduate
  • Navy Nuclear Power School (NNPS) graduate
  • High School/GED and 2 years of related Manufacturing, Shipbuilding, Trades, Military experience
  • High School/GED and 4 years of non-related Manufacturing, Shipbuilding, Trades, Military experience
  • Working knowledge of CVN Ship lay-out, Construction and Nomenclature.
  • Able to read and interpret CVN structural drawings and general notes; comprehend and interpret NDT specifications and drawing requirements; and comprehend and interpret Quality Assurance (QA) procedures (QAI).
  • Able to communicate effectively, both written and verbal; work well with others; work under pressure and independently; follow through with assigned tasks promptly and adapt to changing work schedules, and work assignments/location.
  • Proficient in using SAP, (TcVis) Software and/or other drawing design programs and Microsoft programs (Word, Excel, PowerPoint, Outlook, and Access).
  • Pays attention to details and has a First Time Quality mindset.
  • Open to new ideas/concepts that will improve processes.

Nice To Haves

  • Certifying compartment NDT completion utilizing the 3 Card (NN1641-3) process, using construction area information, unitized and C&A drawings and procedures.
  • Updating and tracking 3 Card progress in SAP structural weld data base for Trade’s accountability.
  • Reporting progress and findings of 3 Cards to Trades and construction supervisors for completion of compartments.
  • Tracking Structural Weld Repair Cards (NN1973); Lifting Pad Inspection, Test, and Records (NN3935, NN3935-1 & NN4376); Foundation Cards, and verifying NDT completion of QID NQC certifications (NN9081).
  • Reviewing CVN structural construction/overhaul drawings, product structure trees, SAP production control notes, Bill of Materials (SWiMS), 3D modeling (TcVis), and packages for fab assembly and NDT requirements.
  • Entering information into SAP or e2058 structural weld databases to initiate, print NN2058s/NN3927s records, distribute, track and certify NDT completion.
  • Determining and laying-off Ultrasonic Testing site locations on Mylar unitized drawings or on TcVis models Nondestructive Test Department layoff and inspection of installation welds for manufacturing and assembly of base-A units, super-lifts, and carrier dry dock construction.
  • Practical experience of Fitting, Welding and/or Inspection of these process lanes is a plus.

Responsibilities

  • Plans sequence of fabrication, assembly, installation, and other manufacturing operations relating to specific portion of the product for guidance of production workers.
  • Plans detail operations from blueprints, engineering orders, change notices, and other engineering releases.
  • Determines the need for tooling and makes recommendations for the design and planning of required tools.
  • Prepares shop work orders for materials and product processing and coordinates with schedulers to ensure that items are being processed according to specifications and time requirements.
  • Maintains progress reports, schedules, and other related records.
  • Certifying compartment NDT completion utilizing the 3 Card (NN1641-3) process, using construction area information, unitized and C&A drawings and procedures.
  • Updating and tracking 3 Card progress in SAP structural weld data base for Trade’s accountability.
  • Reporting progress and findings of 3 Cards to Trades and construction supervisors for completion of compartments.
  • Tracking Structural Weld Repair Cards (NN1973); Lifting Pad Inspection, Test, and Records (NN3935, NN3935-1 & NN4376); Foundation Cards, and verifying NDT completion of QID NQC certifications (NN9081).
  • Reviewing CVN structural construction/overhaul drawings, product structure trees, SAP production control notes, Bill of Materials (SWiMS), 3D modeling (TcVis), and packages for fab assembly and NDT requirements.
  • Entering information into SAP or e2058 structural weld databases to initiate, print NN2058s/NN3927s records, distribute, track and certify NDT completion.
  • Determining and laying-off Ultrasonic Testing site locations on Mylar unitized drawings or on TcVis models Nondestructive Test Department layoff and inspection of installation welds for manufacturing and assembly of base-A units, super-lifts, and carrier dry dock construction.

Benefits

  • medical
  • prescription drug
  • dental and vision plan choices
  • on-site health centers
  • tele-medicine
  • wellness resources
  • employee assistance programs
  • savings plan options (401K)
  • financial education and planning tools
  • life insurance
  • tuition reimbursement
  • employee discounts
  • early childhood and post-secondary education scholarships
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service