Post Tension Technician

FerrovialSan Antonio, TX
Onsite

About The Position

The position of Post-tensioning Technician will perform post-tensioning functions for Equipment department of Alamo NEX Construction LLC of the I35 NEX project. Alamo NEX Construction, LLC is part of the Ferrovial Group in Texas. In 2021, the Texas Department of Transportation (TxDOT) selected Alamo NEX Construction, LLC, a joint venture between Ferrovial Construction Texas, LLC and DBW, LLC (both Ferrovial Group subsidiaries), to complete the Interstate 35 (I-35) NEX Central Project. This project is a $1.5 billion Texas Design-Build (DB) project through the cities of San Antonio, Live Oak, Selma, and Schertz that will consist of non-tolled improvements along I-35, I-140, and Loop 1604. The proposed improvements will include the addition of elevated managed lanes to I-35, addition of 4 connector bridges at the I-35/I-410 North interchange, addition of 4 connector bridges at the I-35/I-140 interchange, and widening of Loop 1604 in Bexar and Guadalupe Counties.

Requirements

  • Level-2 Multistrand and Grouted PT Specialist (PTI)
  • ASBI Certified Grouting Technician
  • Must possess excellent organization and communication skills.

Nice To Haves

  • 2-4 years of work experience in similar document control positions preferred.

Responsibilities

  • Ensure controls are established and followed.
  • Participates in pre-project and pre-task planning activities then communicates with field crews.
  • Motivates team members to work together to accomplish post-tensioning tasks, coordinate work activities with other construction project activities and assign work to employees.
  • Ensure crews are operating all tools and equipment in a safe, proper and productive manner.
  • Provides training and assistance to crews in the performance of post-tensioning work-related tasks.
  • Completes essential paperwork in a clear and accurate manner
  • Provides safety leadership.
  • Control of materials and equipment.
  • Supervise the installation of post-tensioning materials
  • Tendon installation of Tecpresa PT system.
  • Stressing of Tepcresa PT system tendons and bars.
  • Grout trials of the PT tendons.
  • Grout and seal duct vents & grout caps.
  • Post grout inspection.
  • Quality assurance of the deliverables production in the project.
  • Any other reasonable request deemed necessary by management.
  • Equipment maintenance and gauge calibrations
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service