EnergyX is a leader in the global transition to sustainable energy, pioneering its proprietary GET-Lit™ Direct Lithium Extraction (DLE) technology platform that delivers battery-grade lithium faster, cleaner, and with a smaller footprint than conventional evaporation methods. Our America flagship lithium project, Lonestar™ located in the Smackover Region of Texarkana, TX commissioned the largest DLE plant in the U.S. in Q1 2026. Backed by a $5M U.S. DOE grant, EnergyX is on a mission of taking lithium “From Brine to Battery™” and building America’s domestic critical minerals supply chain. The Plant Superintendent is located in Texarkana, TX, onsite at the Lonestar™ Demonstration Plant. The position will own daily production and production standards at the DLE lithium extraction and production facility, serving as the single point of accountability to executive leadership for safe, efficient, and consistent plant output as the site scales from Demonstration to Commercial operations. This role sits at the intersection of hands-on shift leadership and disciplined operational management: the Superintendent will run the floor, while also owning the data, reporting, and continuous-improvement systems that prove out the plant’s performance for internal leadership, project financing, and future FEL estimates. This is a production-focused role; it does not carry engineering/FEL estimating or capital project execution responsibilities, which remain with the Project/Engineering team. This is a contract position due to last through November 2026 (but work may continue after this period). Looking for candidates who reside near the Texarkana area.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
Associate degree