The Materials Planner is responsible for developing and maintaining accurate Bills of Materials (BOMs) within the MRP system to support timely and cost-effective production of custom aircraft interiors. This role ensures material availability aligns with production schedules by translating engineering designs into material requirements, coordinating cross-functionally, and driving improvements in planning accuracy, lead times, and inventory efficiency.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level