The Materials Planner II is responsible for creating and maintaining production schedules based on customer orders and material availability, managing inventory, coordinating component availability with procurement, and monitoring work-in-process. The role adjusts schedules in response to bottlenecks, labor constraints, equipment downtime, and engineering changes, and analyzes capacity requirements to recommend operational adjustments. This position collaborates with manufacturing supervisors, tracks schedule adherence, supports new product introductions, and maintains planning data in the ERP system. It also participates in continuous improvement initiatives. The role is fully onsite at the designated Regal Rexnord office, with most work performed in a manufacturing production environment. Personal protective equipment and safety precautions are required.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
No Education Listed