The Materials Planner II creates and maintains production schedules based on customer orders and material availability, manages inventory levels, coordinates component availability with procurement, and monitors work-in-process. The role adjusts schedules to address bottlenecks, labor constraints, equipment downtime, and engineering changes, while analyzing capacity and recommending changes to staffing, shifts, or machine utilization. The position works closely with manufacturing supervisors to communicate schedule changes and support daily production needs. It tracks schedule adherence, investigates delays and inefficiencies, supports new product introductions, and maintains planning data such as routings, lead times, and work-center capacities in the ERP system. The role also participates in continuous improvement initiatives and performs other duties as assigned. This is a fully onsite role based at the designated Regal Rexnord office. Most work takes place in a manufacturing production environment, including some areas that are not climate controlled. Personal protective equipment and safety precautions are required.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
No Education Listed