Field Superintendent II - Mining Infrastructure

Sundt Construction•Sahuarita, AZ
•Onsite

About The Position

The Field Superintendent II manages day-to-day construction activities, including supervising craft employees and subcontractors, and coordinating field activities with the project schedule. The role is responsible for safety, production goals, quality control, and cost control, and may supervise one or more craft groups or scopes of work. The ideal candidate has experience with heavy industrial or mining infrastructure projects. This position is part of a three-step progression (I, II, and Senior) based on skill and experience. Step II is intended for employees with a greater level of experience and the ability to manage multiple foremen, crews, or subcontractors, or employees with experience on larger and more complex projects. Step II is used for employees with three years of experience in the position or experience on larger and more complex projects. The role is 100% on-site and is not eligible for remote or hybrid work. Visa sponsorship is not available.

Requirements

  • Excellent written and verbal communication skills.
  • At least two years of supervisory experience in similar construction technology, methods, equipment, tools, and work procedures.
  • Understanding of construction scheduling and cost control.
  • Ability to control and supervise employees and subcontractors.
  • Ability to wear required personal protective equipment and comply with safety standards and procedures.
  • Ability to reach above shoulder height and below the waist frequently; stoop, kneel, or bend occasionally; climb stairs or ladders occasionally; and use hands to grasp, lift, handle, carry, or feel objects frequently.
  • Ability to lift, push, or pull objects weighing up to 50 pounds occasionally.
  • Ability to sit, stand, or walk short distances for up to the duration of a shift or workday, and interact with people frequently.
  • Ability to work various shifts, including swing, night, and weekend shifts.

Nice To Haves

  • Experience in heavy industrial or mining infrastructure projects.
  • Experience managing multiple foremen, crews, or subcontractors, or experience on larger and more complex projects.

Responsibilities

  • Emphasize a culture of safety throughout the project and ensure the safety plan is executed.
  • Review shop drawings and design conflicts, review and implement RFIs, manage quality control and safety responsibilities, and coordinate and oversee subcontractors. Ensure the quality management plan is followed and installed work meets or exceeds company expectations.
  • Assist with or manage selection of equipment, construction methods, and sequencing of operations.
  • Assist with or conduct subcontractor meetings.
  • Assist with or manage implementation of LEAN planning.
  • Conduct daily risk management analysis with project leaders to ensure timely mitigation and documentation.
  • Understand project environmental control processes and take corrective action when necessary.
  • Enforce the project management plan so field activities follow plans, policies, and procedures.
  • Manage project control activities and costs daily, take appropriate actions to ensure deliverables and successful execution, demonstrate business acumen, and understand the change management process.
  • On self-perform projects, acquire, develop, and manage craft field teams; communicate performance expectations, provide feedback, determine training and development needs, conduct on-the-job training, and potentially conduct Individual Development Reviews.
  • Oversee, direct, and coordinate manpower, equipment, materials, and subcontract activities in accordance with the project schedule. Ensure material management and applicable change-control processes are followed for contracts or purchase orders.
  • Participate in business development and preconstruction activities as directed.
  • Prepare and maintain detailed schedules for areas of responsibility; develop, control, manage, and communicate scheduling and sequencing changes daily, and take action to ensure timely execution.
  • Review time sheets, quantity reporting, and daily costs for proper preparation and coding. Complete daily reporting accurately and on time in accordance with the Sundt Management System.
  • Use available reports to manage project scope and ensure appropriate steps are taken to build the project successfully in the field. Understand and potentially participate in developing the Monthly Progress Report.
  • Perform other duties as assigned.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service