The Executive Director, Project Management, Industrialization will lead manufacturing and production readiness for Blue Bird’s next-generation F53/F59 chassis platform. The role integrates Plan for Every Part (PFEP), continuous improvement, Lean manufacturing, and operational excellence into an industrialization plan supporting Q1 2028 production within approved budget, schedule, safety, and quality requirements. This is a hands-on position accountable for developing and maintaining detailed project plans, resolving plant-level execution issues, and influencing cross-functional action without direct reports. Responsibilities extend beyond launch to sustaining PFEP, improving operating performance, and developing repeatable manufacturing and supply chain practices. The position coordinates facilities, tooling, equipment, materials flow, process capability, quality systems, workforce readiness, and production ramp. It also develops and maintains PFEP, translates materials data into practical plant processes, supports logistics planning, and leads continuous improvement initiatives. The role works in both office and production environments, including manufacturing areas with exposure to heat, cold, noise, moving objects, and sheet metal. Appropriate PPE must be worn when and where required. Frequent weeks exceed 40 hours, and the role involves frequent communication throughout the day.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Executive