Deck Assembly 2

Bennington Pontoon BoatsElkhart, IN
Onsite

About The Position

Deck Assembly 2 is responsible for assembling various components on the boat to complete installation of the deck.

Requirements

  • Ability to stand and walk frequently
  • Stooping, kneeling, crouching, crawling and bending frequently
  • Must be able to lift and handle up to 50 pounds of material
  • Work inside (without air conditioning)
  • Experience with air and hand tools such as screw guns, impact guns, caulking guns, and air ratchets
  • Safety glasses
  • Gloves

Nice To Haves

  • Strong attention to detail
  • Team building
  • Must be a great problem solver
  • Ability to be cross trained

Responsibilities

  • Drill out rails and patterns for seat clips on each unit
  • Install lids, cleats, side panels, and shifters
  • Measure out stud locations on each unit, assemble shifters, and caulk cleats
  • Read build orders/prints and tape measure
  • Understand process of line moves
  • Maintain organized and clean work area
  • Communicate well with others
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service