Deck Assembly 2

Bennington Pontoon Boats•Elkhart, IN

About The Position

Deck Assembly 2 assembles various components on boats to complete deck installation. The role involves installing and fitting deck components, measuring and drilling, using air and hand tools, reading build orders and prints, and understanding the production line-move process. The position requires frequent movement and physical work in an indoor environment without air conditioning.

Requirements

  • Ability to drill out rails and patterns for seat clips.
  • Ability to install lids, cleats, side panels, and shifters.
  • Ability to measure stud locations, assemble shifters, and caulk cleats.
  • Ability to read build orders and prints and use a tape measure.
  • Experience with air and hand tools such as screw guns, impact guns, caulking guns, and air ratchets.
  • Understanding of the process of line moves.
  • Ability to stand and walk frequently, without standing in one spot for long.
  • Ability to stoop, kneel, crouch, crawl, and bend frequently.
  • Ability to lift and handle up to 50 pounds of material.
  • Ability to work indoors without air conditioning.
  • Ability to be cross-trained.
  • Must wear safety glasses and gloves.

Responsibilities

  • Drill out rails and patterns for seat clips on each unit.
  • Install lids, cleats, side panels, and shifters.
  • Measure stud locations on each unit, assemble shifters, and caulk cleats.
  • Read build orders and prints and use a tape measure.
  • Use air and hand tools, including screw guns, impact guns, caulking guns, and air ratchets.
  • Understand the process of line moves.
  • Maintain an organized and clean work area.
  • Communicate well with others and contribute to team building.
  • Use problem-solving skills and maintain strong attention to detail.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service