Construction Scheduler

RINA•Washington, DC
•Onsite

About The Position

RINA is currently recruiting for a Construction Scheduler to join its project office in Alexandria, Va within the North America Infrastructure & Mobility Division. The Scheduler will be primarily responsible for the review of contractor schedules and for creating, monitoring and updating as-built project schedules. Candidates should have effective time management, strong organizational skills and proficiency in scheduling software.

Requirements

  • Bachelor’s Degree in Engineering, Business, Construction Management or equivalent fields of study
  • 5+ years of experience in scheduling and time impact analysis
  • Infrastructure industry experience required. Rail or Transit experience preferred.
  • Experience with document control and PMIS systems
  • Extensive experience utilizing critical path method (CPM) scheduling and conducting technical review of CPM schedules
  • Advanced knowledge of project scheduling softwares, including Primavera P6 software experience and advanced proficiency utilizing a schedule analysis tool
  • Experience working on state and federally funded projects
  • Advanced proficiency Microsoft Office applications
  • Excellent communication skills with the ability to convey changes, updates and urgencies to multiple parties (client, contractors, colleagues, management) daily.
  • Valid driver’s license required; position requires occasional use of fleet vehicle, personal vehicle, and/or rental vehicle for business-related travel.

Nice To Haves

  • Rail or Transit experience preferred.

Responsibilities

  • Review designer and contractor schedules submittals for conformance to contract and client requirements and industry standard best practices
  • Prepare written technical reports summarizing findings
  • Provide quality review of such reports prepared by others
  • Coordinate with project staff to ensure accuracy of schedule updates and objective performance measurement.
  • Develop and maintain resource and cost-loaded critical path method schedules in Primavera P6 for both projects and master-program level schedules
  • Develop program-level reporting templates and contribute to project and program reporting, providing accurate and timely updates of data.
  • Develop ways to innovate the reporting process
  • Perform independent time-impact analysis
  • Review and provide analysis of contractor’s request for time extension
  • Perform “what-if” schedule and budget scenarios
  • Support change management personnel in resolving outstanding changes + claims
  • Other duties as assigned

Benefits

  • Medical
  • Dental
  • Vision
  • Medical Flexible Spending Account
  • Dependent Care Spending Account
  • Health Savings Account
  • Transit
  • Parking
  • Basic Life
  • Basic AD&D
  • Voluntary Life
  • Voluntary AD&D
  • Short-Term Disability
  • Long-Term Disability
  • Voluntary Accident
  • Voluntary Critical Illness
  • Identity Theft Protection
  • Pet Insurance
  • Employee Assistance Program
  • paid time off
  • company holidays
  • tuition reimbursement
  • nursery grant
  • travel resource services
  • 401K plan with company discretionary match
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service