Assistant Director - Estimating and Pre-Construction

The EthicalEdge GroupHouston, TX
Onsite

About The Position

A rapidly growing construction services organization is seeking a Civil Estimator with data center experience to support a sales team that is currently outperforming the market. This is a high-impact, non-management role with strong upward mobility. The team is winning significant work and needs a sharp estimator who can keep pace and contribute to continued growth. This role is ideal for someone who wants to be part of a winning, high-growth team and is looking for long-term growth and opportunity within a scaling organization.

Requirements

  • Proven experience in civil estimating within commercial and industrial construction environments
  • Strong understanding of site work, utilities, grading, and infrastructure scopes
  • Experience working with high-volume bid environments
  • Ability to manage multiple estimates and deadlines in a fast-paced setting
  • Strong analytical and problem-solving skills
  • Civil engineering: 2 years (Required)
  • Construction estimating: 2 years (Required)
  • Underground utilities installation: 2 years (Required)

Nice To Haves

  • Experience with large-scale commercial or mission-critical projects
  • Familiarity with estimating software and takeoff tools
  • Background working with top ENR contractors or specialty civil firms

Responsibilities

  • Prepare detailed civil construction estimates for data center projects
  • Analyze drawings, specifications, and bid documents to develop accurate cost projections
  • Collaborate closely with sales, operations, and project teams to support winning proposals
  • Perform quantity takeoffs, pricing analysis, and subcontractor/vendor coordination
  • Identify risks, gaps, and opportunities within project scopes
  • Support preconstruction efforts and contribute to bid strategy

Benefits

  • 401(k)
  • 401(k) matching
  • Dental insurance
  • Flexible schedule
  • Health insurance
  • Life insurance
  • Paid time off
  • Vision insurance
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service