Workshop Master Scheduler

OceaneeringAberdeen, WA

About The Position

The primary responsibility of the Workshop Master Scheduler is to manage and optimize the workflow of maintenance and new build activities through the workshop. Achieved by ensuring a seamless, efficient, and cost-effective process is followed by thoroughly managing and analyzing workshop forecasts, conducting precise capacity planning, and managing resources accurately. The role requires close collaboration with various Oceaneering departments to align schedules, anticipate and mitigate potential bottlenecks, and ensure that the workshop operates at peak efficiency. By aligning business priorities with strategic resource allocation, the Workshop Master Scheduler plays a crucial role in achieving the organization's operational and financial goals. Oceaneering is a global provider of engineered services and products, primarily to the offshore energy industry. We develop products and services for use throughout the lifecycle of an offshore oilfield, from drilling to decommissioning. We operate the world's premier fleet of work class ROVs. Additionally, we are a leader in offshore oilfield maintenance services, umbilicals, subsea hardware, and tooling. We also use applied technology expertise to serve the defense, material handling, aerospace, science, and renewable energy industries.

Requirements

  • Management and optimization of workshop workflow.
  • Analysis of workshop forecasts.
  • Capacity planning.
  • Resource management.
  • Collaboration with various departments.
  • Bottleneck anticipation and mitigation.
  • Alignment of business priorities with resource allocation.

Responsibilities

  • Manage and optimize the workflow of maintenance and new build activities through the workshop.
  • Ensure a seamless, efficient, and cost-effective process is followed.
  • Thoroughly manage and analyze workshop forecasts.
  • Conduct precise capacity planning.
  • Manage resources accurately.
  • Collaborate closely with various Oceaneering departments to align schedules.
  • Anticipate and mitigate potential bottlenecks.
  • Ensure the workshop operates at peak efficiency.
  • Align business priorities with strategic resource allocation.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service