Water Meter Installer – Sarasota County Utility Project

Lawton Business SolutionsSarasota County, FL
Onsite

About The Position

We are hiring dependable, motivated Water Meter Installers for a long-term project in Sarasota County, Florida. The project involves upgrading approximately, including the installation of Badger water meters and cellular endpoints, meter/register retrofits, and documentation of the water service lines at each account. This is a production-based field position suited for someone who enjoys working independently, working outdoors, and being rewarded for productivity. Training will be provided on our installation procedures, documentation requirements, meter boxes, valves, risers, and basic repairs.

Requirements

  • Dependable
  • Motivated
  • Ability to work independently
  • Ability to work outdoors
  • Ability to meet production expectations (80 completed installations or retrofits per week after training and initial learning period)
  • Attention to detail for documentation

Nice To Haves

  • Experience with water meter installation
  • Experience with Badger water meters
  • Experience with cellular endpoints
  • Experience with meter retrofits
  • Experience with documenting service lines
  • Experience with handheld data entry

Responsibilities

  • Remove and replace residential water meters, primarily 5/8-inch through 1-inch meters.
  • Perform meter/register retrofits, including larger-meter retrofits when assigned.
  • Install and activate Badger cellular endpoints.
  • Identify and document the city-side and customer-side service line material.
  • Take clear required photographs before, during, and after each installation.
  • Record old and new meter numbers, readings, transmitter information, and other required information.
  • Shut off and restore water service safely.
  • Flush water lines and inspect installations for leaks.
  • Verify proper meter installation and flow direction.
  • Replace meter lids, boxes, risers, and valves when required.
  • Keep the installation area clean and remove old material and debris.
  • Complete required handheld records and paperwork accurately.
  • Return old meters and completed paperwork at the end of the workday.
  • The project requires detailed documentation of each installation, including photographs of the existing meter setting, service line materials, meter information, flushing, and the completed installation.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service