The City of Salem is looking for full-time Wastewater Treatment Plant Operators. This recruitment is open to multiple classifications including: Operator II, Operator I, and Operator-In-Training (OIT). For OIT candidates, Wastewater Treatment Plant Operator I certification must be obtained within 15 months of employment. Willow Lake is the primary treatment facility for the City with a dry weather secondary treatment capacity of 65 mgd, a wet weather secondary treatment capacity of 105 mgd, and a peak wet weather capacity of 155 mgd. It can be operated in trickling filter/activated sludge, conventional air activated sludge and in a combination of both processes plus selective treatment based on flow and load fluctuations. The River Road Peak Wet Weather Treatment Facility is a high rate, physical chemical ballasted flocculation facility with ultra-violet disinfection. This facility is operated only when flows at the Willow Lake Facility are above 95 mgd. Operation of this remote facility is permitted for use to prevent sanitary sewer overflows associated with wet weather. The City's treatment facilities serve a population of 256,000 within a three-city area. The facility staff of 53 employees provide Operations, Maintenance, Laboratory, Biosolids, and Administrative Services for both facilities.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
High school or GED