The East Burlington Wastewater Treatment Plant (EBWWTP) is located on Stone Quarry Road in Burlington and was originally constructed in 1961 as 6.0 MGD trickling filter plant. In 1993, the plant was upgraded to an activated sludge with a treatment capacity of 12.0 million gallons per day (MGD) before undergoing further upgrade to include a 3-stage biological nutrient removal (BNR) process in 2014. The plant treats wastewater originates from areas within Burlington’s city limits and extraterritorial jurisdiction (ETJ), the Town of Green Level, the Town of Haw River, and portions of the Town of Gibsonville and the Town of Elon.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Manager
Education Level
High school or GED