Tool Install PMO Executive, North Phoenix, AZ - Semiconductor

World Wide Professional Solutions•North Phoenix, AZ
•Onsite

About The Position

WORLD WIDE PROFESSIONAL SOLUTIONS (WWPS) is seeking an experienced Tool Install PMO Executive to provide senior program leadership for a large-scale semiconductor manufacturing construction project in North Phoenix, Arizona. This director-level position leads the project management office responsible for integrated tool installation planning, governance, controls, and delivery in support of fab readiness and manufacturing ramp objectives. The role works closely with a confidential semiconductor client and guides Tool Install Project Managers, Construction Managers, project controls personnel, trade partners, equipment vendors, and specialty contractors. It requires executive-level judgment, direct semiconductor tool installation leadership experience, and the ability to drive performance across multiple concurrent scopes. The executive oversees tool-install program priorities, integrated scheduling, program controls, cost and change management, staffing and sequencing, risk, safety, quality, contamination control, and turnover readiness. The role coordinates cleanroom and subfab installation activities and interfaces with base-build MEP and process utility infrastructure, including tool-specific hookups. It also represents the program in senior client and stakeholder discussions, provides executive reporting and recommendations, resolves high-impact issues, and champions Lean Construction and continuous improvement. The position is based at a semiconductor construction project in North Phoenix, Arizona, with close engagement with onsite teams and client stakeholders. Travel, mobilization, relocation, or per diem arrangements depend on project requirements and individual circumstances. This is a full-time, direct employment opportunity with WWPS. Benefits begin the first of the month following the start date. WWPS provides equal employment opportunities and prohibits discrimination and harassment as described in the posting.

Requirements

  • 15+ years of progressive construction, project, or program delivery experience, with leadership accountability on major, technically complex capital projects.
  • 8+ years of direct semiconductor construction experience, including substantial hands-on program or project leadership for semiconductor tool installation and tool hook-up.
  • Demonstrated ability to lead multiple Project Managers or major installation work packages and influence multidisciplinary contractor, engineering, vendor, and client teams.
  • Strong understanding of the semiconductor equipment installation lifecycle, from design and utility requirements through tool move-in, hook-up, commissioning support, and equipment sign-off.
  • Working knowledge of cleanroom and subfab construction, process utilities, MEP interfaces, equipment vendor coordination, and manufacturing readiness requirements.
  • Advanced capability in CPM scheduling, Primavera P6, project controls, program reporting, cost forecasting, contract interpretation, and change management.
  • Track record of managing complex program risks, contractor performance, executive stakeholder relationships, and high-impact issues under demanding milestone schedules.
  • Strong executive communication, negotiation, organizational leadership, and decision-making skills.

Nice To Haves

  • Experience in a Director, Program Executive, PMO Leader, Senior Program Manager, or comparable tool-install leadership role supporting a semiconductor fab.
  • Background with an Owner’s Representative, EPCM organization, major construction manager, mechanical contractor, or specialty tool-install contractor.
  • Bachelor’s degree in Engineering, Construction Management, or a related field; equivalent relevant experience will be considered.
  • Familiarity with PMWeb, Primavera, Excel, Word, and integrated construction reporting systems.

Responsibilities

  • Provide overall PMO leadership for semiconductor tool installation execution, establishing program priorities, decision rights, reporting standards, and accountability across major installation work packages.
  • Lead and mentor Tool Install Project Managers, Construction Managers, planning and controls teams, and other program resources; set expectations for performance, issue resolution, and consistent execution.
  • Represent the tool install program in senior-level discussions with client leadership, Facilities, Manufacturing, Equipment Engineering, design teams, contractors, and equipment suppliers.
  • Oversee the integrated tool install master schedule and dependencies among base-build completion, utility system turnover, tool delivery, move-in, setting, hook-up, commissioning, and equipment sign-off.
  • Establish program controls and executive dashboards covering milestone performance, installation readiness, cost, change management, constraints, contractor productivity, risk, and forecasted completion.
  • Lead strategic coordination across cleanroom and subfab work, including tool placement and alignment, rigging and anchoring, and tool-specific interfaces with base-build MEP and process utility infrastructure.
  • Provide technical and execution oversight for hook-ups involving ultra-pure water, process piping, bulk and specialty gases, chemical distribution, exhaust, electrical power, and related support systems.
  • Ensure coordinated review of equipment vendor requirements, utility matrices, installation drawings, scope boundaries, and interface responsibility before field execution.
  • Direct program-level staffing and sequencing strategies with trade partners and specialty contractors, addressing labor availability, workface access, cleanroom protocols, and competing installation priorities.
  • Oversee budget performance, cost forecasting, change orders, commercial exposure, and schedule impacts; guide resolution of major scope gaps and contractor or vendor disputes.
  • Maintain a disciplined risk and escalation process for late engineering, material availability, utility readiness, equipment delivery, access restrictions, and other threats to the factory ramp schedule.
  • Set safety, quality, contamination-control, and work-authorization expectations across participating teams in active cleanroom and manufacturing environments.
  • Hold contractors and vendors accountable for performance, recovery plans, installation quality, closeout documentation, and readiness to support commissioning, qualification, and startup.
  • Align turnover packages, system acceptance, punch-list closeout, and tool-readiness milestones with the client’s Facilities, Equipment Engineering, CQV, and manufacturing stakeholders.
  • Provide concise executive reporting and actionable recommendations to project and client leadership, escalating critical decisions early and driving timely corrective action.
  • Champion Lean Construction, consistent PMO processes, and continuous improvement initiatives that reduce installation cycle time and improve program predictability.

Benefits

  • Medical insurance
  • Dental insurance
  • Vision insurance
  • Life insurance
  • Short-term disability coverage
  • Long-term disability coverage
  • 401(k) with company match
  • Paid holidays
  • Paid time off
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service