The Sr. Construction Project Leader will initially lead CannonDesign’s preconstruction and construction-phase work on a single, highly complex, 2.0+ million-square-foot healthcare facility at Mayo Clinic’s campus in Rochester, Minnesota. The position requires consistent onsite presence; CannonDesign provides relocation and temporary relocation support. The role is focused on process leadership rather than document administration, integrating construction expertise with design throughout project delivery. The leader works with the design team and the client’s construction manager or builder to address constructability, cost, schedule, and delivery-model needs, and serves as CannonDesign’s senior field voice once construction begins—protecting design intent and the firm’s commercial position while working as a peer with the builder. During preconstruction, the leader builds construction considerations into design documents, leads constructability and coordination reviews, supports value engineering and target value design, tests schedules and cost assumptions, and advises on delivery models, bid packaging, early work, GMP development, and contractor selection. The position also leads design integration across disciplines and manages delegated design, design-assist, and deferred-submittal interfaces. During construction, the leader directs the firm’s construction-phase services, including the CA team, field presence, quality program, issue resolution, risk management, site observations, and project closeout. The role also advises on contractual and commercial risk, supports change and claim avoidance, reports project performance, transfers lessons learned, contributes to firm standards and initiatives, and mentors project team members. The position reports jointly to the assigned project’s Project Director and the Executive Director of Operations - AEI.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior