About The Position

Turner & Townsend is seeking an Electrical Project Manager – Data Center Construction with Field Experience to support a high-profile data center construction project. This individual will be responsible for overseeing the General Contractor’s construction activities, with a strong focus on reporting on schedule status back to the project owner. The ideal candidate will bring deep technical expertise from working in the field, strong leadership, and a background in large-scale data center/mission critical works or electrical contracting environments.

Requirements

  • Bachelor’s degree in Electrical Engineering, Construction Management, or related field.
  • Minimum 5+ years of electrical project management experience, ideally in data center construction or with an electrical contractor.
  • Experience with substation and power distribution systems preferred.
  • Familiarity with MEP design
  • Strong leadership, communication, and problem-solving skills.
  • Proficiency in project management tools
  • Knowledge of relevant codes, standards, and construction methodologies.
  • Proficiency in the Data Center Commissioning Process (levels 1 –5 )
  • Proficiency managing construction documents including BODs, specifications, contract drawings, C/D/E’s, equipment submittits and RFIs.
  • Proficiency in Excel, Word, PowerPoint, Outlook, Procore, P6, CxAlloy, and other construction project management tools

Responsibilities

  • Effectively manage and collaborate with project stakeholders.
  • Effective communication across our internal team to ensure efficiency and a consistent delivery to the client.
  • Can analyze, track, and effectively manage critical milestone activities to avoid schedule slip.
  • Verify that effective project governance, processes and systems are utilized.
  • Ensure application of best practice on all projects.
  • Production of formal project status reports and other reports as required.
  • Monitor the progress of multiple construction projects simultaneously to ensure that the approved design standards are being applied correctly.
  • Manage the interface between all suppliers through monthly trackers and weekly reviews.
  • Manage the flow of project information between the project team through regular meetings and written communications.
  • Forecast and update key project milestones.
  • Manage and monitor local design teams in accordance with commission criteria.
  • Provide technical support to owners, architects, general contractors and regional stakeholders.
  • Rapid response to RFIs from the field.
  • Provide expertise for cost control, value engineering, and constructability guidance where required.
  • Independent review of status reports, drawing submittmits, timelines and costs from architects, contractors and suppliers.
  • Client management – assist in developing excellent working relationships with Clients, with a view towards maximizing new opportunities.
  • Strategic Thinking - provides advice to project teams on approaches that can be adopted to successfully achieve both clients’ objectives and business objectives.
  • Knowledge management – ensure that key information and learnings generated from each project is captured.
  • Process improvement – Identify ways to improve internal systems and processes
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
  • Oversee all phases of electrical construction, from preconstruction through L5 commissioning.
  • Oversee design coordination, procurement, installation, and closeout of all mission critical systems, with an emphasis on electrical support.
  • Ensure alignment with project goals, client expectations, and quality standards.
  • Foster a collaborative, high-performing team environment.
  • Maintain clear communication with clients, contractors, and internal stakeholders.
  • Oversee and report on works status in the field against the General Contractor’s schedule and report on this daily and as required by the owner
  • Review and provide feedback against the GC contract schedule to mitigate and expose opportunities to avoid any impacts to the critical path.
  • Provide subject matter expertise in electrical systems, including substations, transformers, and power distribution.
  • Ensure compliance with design specifications, codes, and industry standards on field walks as part of QA/QC responsibilities
  • Identify project risks and report feedback on mitigation strategies to the General Contractor and owner
  • Ensure all electrical work meets quality and safety standards.
  • Manage method of procedure (MOP) review, feedback and execution.
  • Maintain/contribute to the site progress photo log and weekly reporting
  • Assist in managing the closeout of all CX issues identified in the field with project stakeholders

Benefits

  • We provide a great place to work, where each person has the opportunity and voice to affect change.
  • We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service