The City of Pinole is hiring two part-time seasonal Public Works Maintenance Worker Assistants to support road repair operations, including crack sealing. The seasonal opportunity is anticipated to run through February or March 2027, with work up to 30 hours per week. Under supervision, the assistant performs routine unskilled and semiskilled tasks supporting the construction, modification, maintenance, repair, and operation of City infrastructure, including streets, parks, landscaped areas, trees, storm and wastewater collection systems, and facilities. This entry-level position supports maintenance teams while developing experience and proficiency in public works operations. The role receives direct supervision from higher-level Public Works staff and has no supervisory responsibilities. The work includes assisting with street and park maintenance, storm drain and wastewater system maintenance, and general facility and infrastructure maintenance. The position works indoors and outdoors, including in varying weather conditions, and may involve standby assignments, off-hours shifts, emergency overtime, traffic exposure, chemicals, and other potentially hazardous conditions.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Part-time
Career Level
Entry Level
Education Level
High school or GED