This is a temporary position for a Production Worker on the Paint Line, working the 2nd shift from 2:30 PM to 11:00 PM, Monday through Friday. There is potential for full-time hire with benefits. The role involves supplying or holding materials or tools, cleaning work areas and equipment, operating machinery, recording inspected products, loading and unloading materials, and counting to determine order completion.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Career Level
Entry Level
Education Level
High school or GED