The 2nd Shift Pre-Stage Technician is responsible for preparing tooling by studying work orders, quality envelopes, specification drawings, and production parts. This role involves gathering necessary tooling, parts, tools, and materials, ensuring all tooling is properly stamped before release to production. The technician will lift, position, and secure tooling, review and maintain logs and check sheets, and perform tooling inspections and preparation. They will also be involved in the installation and removal of tooling for various stations, perform post-production inspections, and make minor repairs to tooling and equipment. Additionally, the role supports the overall maintenance of pre-staging equipment, verifies specifications using measuring instruments, and maintains supplies inventory. The technician will ensure master tooling is properly labeled and segregated, communicate production issues to the next shift, assist with on-the-job training, and take corrective action for machine stoppages, notifying supervisors of serious issues. Safety and cleanliness are paramount, requiring recognition and correction of hazards, adherence to safety policies, and participation in Lean Manufacturing Events.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
High school or GED