Saylor Consulting Group is seeking a full-time Lead Office Engineer to support our client, the San Francisco Public Utilities Commission (SFPUC). The role provides office engineering and construction management services for the Moccasin Dam and Reservoir Long-Term Improvements Project, as part of an anticipated multi-year construction management contract. Work must be done in person. Under the contract, all services are performed onsite, full-time, at the project site in Moccasin, California (Tuolumne County), and remote work is allowed only at the SFPUC Regional Construction Manager's discretion. The Lead Office Engineer will support construction management of a major water infrastructure project within the SFPUC's Hetchy Capital Improvement Program. The project will increase spillway capacity at Moccasin Dam, an earth and rockfill dam built in 1930. Planned work includes: access improvements and utility relocation heavy excavation and blasting retaining walls a new concrete spillway with underdrain systems a single-span concrete bridge over the spillway downstream creek channel improvements a temporary bypass of the Grizzly Gulch Canal The project uses the Construction Manager/General Contractor (CM/GC) delivery method. Pre-construction runs through 2028, and construction is expected from late 2028 through 2032. Working under the SFPUC Regional Construction Manager and the Resident Engineer, the Lead Office Engineer will manage the flow of contract documentation between the contractor, the SFPUC construction management team, design engineers, operations staff, and environmental compliance staff. The role is central to keeping submittmits, RFIs, contract documents, and record drawings accurate and processed on time over the life of the project. All work follows the HCIP Construction Management Plan and SFPUC CM procedures.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior