This position is responsible for operating, monitoring, and performing routine maintenance on utility and energy-related assets located within the newly constructed Central Utility Plant (CUP) and related auxiliary equipment around Ford’s BlueOval Battery Park Michigan complex located in Marshall, MI; along with the associated distribution infrastructure needed to supply utility services to BlueOval Battery Park Michigan. Plant equipment includes the following: (2) 7.8 MW Solar Taurus 70 Gas Turbine Generators with associated Rentech 160 KPPH Heat Recovery Steam Generator’s with Duct Burners and Fresh Air Firing capability, (2) 14,000 MBH Hot Oil Heaters, (4) 25,000 MBH, steam-to-hot water heat exchangers, economizers, deaerators, boiler feed water pumps, and condensate pumps. Also included is a 14,450 ton modular chilled water plant with an associated 15-cell, 48,000-gpm modular cooling tower. Balance of plant equipment includes air compressors, water treatment systems, pumps, filters, instrumentation, PLC controls, electrical systems (15/5 kV, 480 V and 125 VDC), and associated distribution infrastructure for the above.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
High school or GED