Solidus Resources, a U.S.-based gold development company backed by Waterton Mining, is seeking a Mid Range Mine Engineer for its Spring Valley Gold Project. This large-scale open pit gold heap leach operation, located in the prolific Humboldt Range, boasts a >10 year mine life and an annual production profile exceeding 300,000 oz. The project utilizes 300-ton class autonomous mining haul trucks and hydraulic shovels, with a sophisticated crushing and conveying system for higher-grade ore and direct stacking for low-grade ore. The operation includes a segregated heap leach pad, an ADR facility for gold processing into dore bars, and extensive site infrastructure. The Mid Range Mine Engineer will be responsible for developing and delivering executable mine plans aligned with the Life of Mine (LoM) strategy and annual budgets, ensuring optimal production, cost efficiency, and consistent ore feed to the leach facility. This role is key in advancing a digitally enabled, autonomous mining environment through data-driven planning, system integration, and cross-functional collaboration.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level