Mechanical Engineer - Facilities

Kunin Technologies•Chattanooga, TN

About The Position

Kunin Technologies is developing advanced separation technologies to recover critical minerals from overlooked resources. The company is automating roll-to-roll processing of ion-exchange media and is building a demonstration production line in Chattanooga, Tennessee, with delivery targeted by the end of 2027. This line will serve as the basis for a future greenfield manufacturing facility at ten times the scale. The Mechanical Engineer is responsible for the facility’s mechanical systems and their interface with the production line. This includes utility piping, pumps and tanks, exhaust handling, HVAC and ventilation, and installation packages that support equipment from delivery through commissioning. The role also contributes to mechanical scopes for the future facility and troubleshoots and upgrades infrastructure as the line approaches nameplate capacity. The position is part of a ten-person team. Intermittent travel to partners’ facilities may be required, and extended hours and weekends are frequently required to support critical project milestones.

Requirements

  • At least 3 years of experience in facilities or plant engineering with ownership of mechanical systems in industrial, chemical, semiconductor, or similar manufacturing sites.
  • Experience designing and installing utility piping, HVAC, or mechanical equipment packages in an operating facility.
  • Experience with CAD and piping design tools such as SolidWorks, AutoCAD Plant 3D, or similar.
  • Ability to work in a fast-paced and demanding environment.
  • Creative problem-solving ability that integrates mechanical design, utilities, equipment installation, and plant operations.
  • Must be a U.S. citizen.
  • Ability to work extended hours and weekends frequently to support critical project milestones.

Nice To Haves

  • Bachelor’s degree in mechanical engineering.

Responsibilities

  • Design mechanical utility systems, including process piping, pumps, tanks, compressed air, and exhaust handling.
  • Develop equipment installation packages, including layouts, rigging plans, anchoring, and utility tie-ins for line equipment.
  • Design HVAC and ventilation for chemical processing areas in coordination with outside engineering firms.
  • Develop mechanical scopes for the greenfield facility, including specifications, vendor bids, and installation oversight.
  • Troubleshoot and upgrade mechanical infrastructure as the production line approaches nameplate capacity.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service