The Master Scheduler will lead the transformation of our production planning environment from reactive, spreadsheet‑based scheduling to a fully integrated Master Production Schedule (MPS) and a mature Sales & Operations Planning (S&OP) process. This role supports the Materials Manager and collaborates closely with Supply Chain, Engineering, Project Management, and Operations to create material‑aligned, capacity‑feasible schedules for our engineered‑to‑order (ETO) products—including large rooftop air‑handling units, Flex Air systems, pump stations, water‑cooled piping modules, and modular electrical substations. These projects involve oversized steel structures, heavy piping, electrical gear, and crane‑managed material flow. The Master Scheduler will be responsible for bringing discipline, predictability, and visibility to our planning environment and ensuring that all functions operate from one unified plan.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Number of Employees
11-50 employees