The Master Scheduler is responsible for preparing the master production plan (MPS) based on the production plan presented in the SIOP. This role requires timely reporting of any issues that may arise in fulfilling the plan, such as material shortages, machine capacity constraints, or lack of man-hours. The Master Scheduler will expedite operations and/or materials that are affecting the production schedule and, consequently, the monthly shipping and/or sales plan. This position involves supervising the efficient control of work orders on the production floor, supporting planners with problems, and reporting to the area manager if goals are not met. The role also includes planning, developing, and implementing improvements to the production control system, participating in inventory reduction plans, and following up on the NPI (MPS) file. Additionally, the Master Scheduler will coordinate with different departments to improve the performance of the department and production, and supervise personnel in the area, assigning tasks to ensure a continuous flow of work, performing performance evaluations, and recommending development plans.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level