About The Position

Solvere Technical Group is actively seeking a qualified Integrated Master Schedule and Earned Value Management System (IMS/EVMS) Surveillance Support Specialist candidate for an upcoming U.S. Coast Guard opportunity. This position is contingent on award.

Requirements

  • Comprehensive knowledge of shipbuilding processes.
  • Proficiency in MS Project and Primavera scheduling software.
  • Ability to produce EVM reports, briefs, and presentations.
  • Knowledge of economic, statistical, accounting, and financial analysis principles and techniques.
  • Familiarity with DCMA standards and ANSI-EIA 748 guidelines.
  • Knowledge of DCMA and DCAA auditing organizations and the overall acquisition process.
  • Knowledge of Microsoft Office suite including Word, PowerPoint, Power BI, and Excel.
  • Physical ability to walk through an active shipyard and OPCs under construction.
  • Bachelor's degree in an engineering or related technical/business field required or Five (5) or more additional years of relevant experience, or EVM certification (EVMP or EVMD/EVMO).
  • Minimum of five (5) years of experience supporting project management and shipbuilding processes required.
  • Secret level security clearance required.
  • Non-Disclosure Agreement (NDA) required.

Responsibilities

  • Plan, organize, and conduct EVMS surveillance activities to ensure the shipbuilder's management control system complies with EVMS guidelines and provide timely indications of actual and potential problems.
  • Conduct detailed analysis of the Shipbuilder's IMS for all OPCs; determine compliance with OPC Production Contract/CLIN requirements, DCMA standards, and ANSI-EIA 748 guidelines.
  • Maintain OPC physical progressing model using Microsoft Project, SharePoint, and Power BI; audit shipbuilder reported physical progress as directed by the PMR.
  • Assist in validating Shipbuilder EVM variance reports (CPR, CFSR, CCDR, IMS); reconcile reports and assess system health.
  • Assist in determining PMB compliance and EAC analysis; review Contractor external cost and schedule reports.
  • Identify and analyze schedule conflicts or delays; propose resolutions and provide input to risk management activities.
  • Develop and provide comprehensive EVM/IMS reports and presentations detailing findings, risks, and recommended corrective actions.
  • Create and update the USCG OPC PRO program plan annually utilizing Primavera or MS Project, including WBS, work packages, task books, and time-phased costs.
  • Conduct production surveillance in Shipbuilder facilities and onboard OPCs under construction; conduct CDRL review and generate contract correspondence.
  • Prepare scheduling materials (Gantt Charts, Milestone Charts) and attend meetings; provide EVM and IMS status presentations.

Benefits

  • medical, dental, and vision insurance for the employee and/or families
  • basic life insurance
  • short- and long-term disability for the employee
  • 401k plan
  • paid time off
  • paid holidays
  • supplemental insurance plans
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service