The MBTA’s Infrastructure Planning team focuses on early design projects, master planning, strategic capital initiatives, and process improvement for the Engineering and Capital Division. Example initiatives include bus electrification, the Nubian Square busway redesign, right-of-way planning tools, and the MBTA Signal Master Plan. Previous co-op projects have included analyzing station access and ridership data, developing dashboards and architectural diagrams, preparing construction work-zone graphics, researching transit-agency maintenance facility standards, and conducting facility visits. The co-op works directly with Infrastructure Planning Project Managers and supports projects according to team needs and the co-op’s goals. The role is intended for undergraduate students in planning, data analytics, engineering, construction management, architecture, environmental science, or a related field. It is an onsite, 40-hour-per-week position lasting at least six months, from January through June. The posting seeks two co-ops and states that graduate students will not be considered. The position is based at 10 Park Plaza in Boston. Co-ops must be able to work in person at least three days per week; five days per week is preferred. Work may also include occasional site visits to facilities in the Greater Boston area. The MBTA’s mission is to provide safe, reliable, and accessible transportation, and its core values include safety, service, equity, sustainability, culture, and accessibility.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Intern