Encyclis is building a brand new Energy Recovery Facility in Walsall. This facility will be a sustainable alternative to landfill, using residual waste as a fuel to generate clean electricity. The facility is in its construction phase and is expected to commence full commercial operations in 2027. It will provide a vital outlet for the sustainable disposal of over 436,000 tonnes of residual waste per year and will generate 49 megawatts of low carbon energy, enough electricity to meet the needs of over 90,000 homes. At Encyclis, it’s our people and their passion that drive us forward. We’re growing fast, thinking differently, and innovating at every step.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
Associate degree