Data Center Construction Security Officer

Salute Inc.•Abilene, TX
•$0 - $20•Onsite

About The Position

Salute is a leading provider of cutting-edge Data Center Infrastructure Services, dedicated to serving data center clients worldwide. We pride ourselves on delivering sustainable solutions, unparalleled reliability, and outstanding customer service. As we continue to grow, we are seeking a dynamic and experienced Data Center Construction Security Officer join our team and drive our relationships with hyperscale clients to new heights. This position is located in Abilene, TX.

Requirements

  • Customer service experience
  • A team player with a helpful disposition
  • Excellent computer skills
  • High School Diploma or equivalent
  • Able to pass a background check and 10-panel drug screen (zero tolerance drug policy)
  • Texas DPS Guard Card
  • Overtime will be required at times
  • Ability to lift and carry heavy equipment, up to 40lbs.
  • Ability to climb ladders and multiple flights of stairs to access elevated equipment
  • Ability to stand for long periods of time in various work environments
  • Ability to bend, stoop, kneel, and reach for equipment related tasks
  • Basic physical fitness to respond quickly to emergency situations and navigate areas quickly
  • Ability to move quickly and efficiently withing various work environments to troubleshoot issues or respond to emergencies.
  • Good hand-eye coordination and dexterity for working with small components and connectors
  • Clear vision, with or without correction, to perform tasks requiring attention to detail and precision while wearing safety glasses
  • Ability to differentiate between color-coded warning signs, labels, and cables
  • Ability to work in environments with a wide variety temperature inside a facility
  • Ability to work outdoors in various weather conditions, including extreme temperatures, rain, or snow
  • Capability to work in environments with elevated noise levels while wearing hearing protection
  • Possession of a valid driver’s license for work-related travel, as required

Responsibilities

  • Conduct unarmed foot and/or vehicle patrol (interior and/or exterior)
  • Control access and egress
  • Monitor closed-circuit televisions and alarm systems
  • Compose reports
  • Deter criminal activity and misconduct
  • Perform other duties as specified in post orders
  • Patrol exterior grounds of the facility
  • Provide access control for gates ensuring only authorized personnel are permitted
  • Manage traffic flow at gates to ensure no disruption in business operations
  • Maintain access log
  • Monitor cameras after normal working hours
  • Notify your Shift Lead of Supervisor of any issues
  • Observe and report any suspicious activity
  • Maintain awareness of surroundings to promote physical security and safety; watch for irregular or unusual conditions that may create security concerns or safety hazards
  • Observe departing personnel to protect against theft of company property and ensures that authorized removal of property is conducted within appropriate client requirements
  • Contribute to communication and awareness of security policies and issues as needed; warn violators of rule infractions, such as loitering, smoking or carrying forbidden articles
  • Permit authorized persons to enter property and monitors entrances and exits; control/direct traffic; Observe departing personnel to protect against theft of company property and ensure that authorized removal of property is conducted within appropriate client requirements

Benefits

  • 8 company-paid holidays
  • 2 floating holidays
  • PTO
  • Medical, Dental, and Vision insurance
  • Employee Assistance Program
  • Employer-supported 401(K) with immediate 100% vesting
  • 3% employer match on 401(K)
  • 50% match on the next 2% of 401(K)
  • HSA
  • Mental health resources
  • Gym discounts
  • Discounted group programs
  • Legal services
  • Home & auto insurance
  • Pet insurance
  • ID theft protection
  • Parental leave
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service