Data Center - Construction Manager

AFL TelecommunicationsAbilene, TX

About The Position

AFL provides industry-leading fiber optic products and services across the globe. Our company was founded in 1984 with a single fiber optic cable and now we manufacture over two thousand products, employ over 5,000 associates and consistently generate annual sales in excess of a billion-dollars in revenue. With our commitment to professional growth and employee development, let AFL “Connect” you to your next career opportunity! Job Summary – Data Center Construction Manager The Data Center Construction Manager leads fast pacedinfrastructure build outs, upgrades, and expansion projects within hyperscale, enterprise, and colocation data centers. This role executes project plans by coordinating and scheduling assignments, managingmaterialslogistics, equipment, contractors, and toolsrequiredto deliver projects on time and within budget. The position requires proactive communication, detailed planning, and strong collaboration with both internal and external stakeholders. This is a key leadership role responsible for ensuring all construction and installation activities meet customer expectations, datacenter standards, and compliance requirements.

Requirements

  • Associate degree in a related technical field, orfive (5) yearsequivalent experience in datacenter ormissioncriticalfacility construction/management.
  • Strong technical background in datacenter infrastructure, including electrical, mechanical, and structured cabling systems.
  • Familiarity with IT, networking, and datacenterarchitectures.
  • Ability to think critically,problemsolve, and make sound decisions under pressure.
  • Ability to handle sensitive information with discretion.
  • Strong organizational skills and attention to detail.
  • Exceptional written and verbal communication abilities.
  • Mustbe authorized towork in the United States.

Nice To Haves

  • Current industry certifications preferred (e.g., BICSI, OSHA, PMP, Data Center ops certifications).
  • B.A.or equivalent experience in Business Administration/Engineering

Responsibilities

  • Reports directly to the Operations Manager and leads onsite construction and installation teams.
  • Coordinatesdaytodayactivities for electrical, mechanical, cabling, commissioning, and general construction crews.
  • Conducts daily safety briefings, JSA’s, toolbox talks, and enforces adherence to all site safety requirements.
  • Oversees the installation and integration of data center systems including: rack/stack hardware, structured cabling, fiber systems, PDUs, busway, grounding, containment systems, HVAC components, and power distribution equipment.
  • Working knowledge ofAC/DC power systems, UPS systems, battery strings, generators, and -48Vdc power.
  • Ability to lead crews through complex tasks on active datacenter floors and equipment rooms.
  • Demonstratedproficiencyin at least one area: structured cabling, fiber splicing/testing, electrical/conduitinstallation, mechanical systems, or equipment commissioning.
  • Working knowledge of test equipment including OTDR, power meters, fiber certification testers, thermal imaging tools, circuit analyzers, and other commissioning gear.
  • Ability to evaluate test results, troubleshoot infrastructure faults, respond to trouble tickets, and support maintenance activities.
  • Conduct site surveys, quality assurance reviews,punchlistwalkdowns, and verify construction meets design and customer standards.
  • Prepare daily/weekly progress reports, feasibility assessments, and project documentation.
  • Manage material procurement, storage, and onsitelogistics.
  • Ensure all installation work aligns with engineering drawings, MOPs, and datacenter operational requirements.
  • Collaborate with electrical, mechanical, network engineering, commissioning agents, and facility operations toidentifyand resolve issues.
  • Provide customer support, including direct communication during builds, guidance on issue resolution, and management of customer expectations.
  • Ensure compliance with company Environmental, Health & Safety (EHS) policies.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service