Construction Scheduler

Corbins•Phoenix, AZ

About The Position

Nox Group is seeking a Project Scheduler to support complex, large-scale data center and mission-critical construction projects. The scheduler assists with developing, maintaining, and updating Critical Path Method (CPM) schedules throughout all project phases, coordinating across design, procurement, construction, and commissioning. The role develops baselines, maintains working schedules from project initiation through closeout, creates what-if and optimization scenarios, and coordinates and leads schedule update meetings and pull-planning sessions. It also produces reports in varying formats for project teams. This safety-sensitive position may involve physical working conditions and requires compliance with applicable policies, including drug testing and background checks. Nox Group is an equal opportunity employer and applies its nondiscrimination policy to all terms and conditions of employment.

Requirements

  • At least five years of P6 CPM scheduling experience in similar markets.
  • Excellent communication skills.
  • Proficient use of Microsoft Office Suite, especially Excel.
  • Complete understanding of current scheduling concepts and best practices.
  • Thorough understanding of CPM scheduling methodologies.
  • Ability to work in a dynamic environment.
  • Ability to safely perform the inherent physical responsibilities of the role, which may include lifting up to 50 pounds; repeated pushing, pulling, carrying, reaching or working above shoulder level, walking, standing, sitting, stooping, kneeling, bending, and climbing; and potentially operating a motor vehicle, crane, tractor, or similar equipment.

Responsibilities

  • Develop the project schedule using available support documentation, including design drawings, contracts, and specifications.
  • Incorporate design deliverable documents into the schedule and identify design risks.
  • Work with material management to ensure deliveries support installation timeframes.
  • Develop and manage sufficient schedule detail to perform the work successfully.
  • Conduct constructability reviews to validate sequencing and logic.
  • Identify and communicate risks and opportunities.
  • Frequently analyze critical and near-critical paths and communicate risks to the project team.
  • Hold weekly schedule update meetings to ensure the project plan contains accurate, current status and information.
  • Oversee pull-planning sessions with the construction team and ensure compliance with baseline schedule summary activities.
  • Conduct regular site walks to understand field conditions and dynamics, validate progress, and identify potential risks and opportunities.
  • Produce project schedule reports in varying formats.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service