Construction Scheduler

Hoffman Construction Company•Boise, ID
•Onsite

About The Position

The Construction Scheduler works within the Scheduling department and reports to the Scheduling Manager. The Scheduler uses complex project data to update schedules, incorporate logic changes and delays, and analyze schedule progress in close coordination with Project Managers and Project Superintendents. The position is fully in person on site in Boise, Idaho, and supports a collaborative, team-focused environment. The role requires a minimum of two years of construction project scheduling experience using Primavera P6. A high school diploma or GED is required. A bachelor’s degree in Civil Engineering, Construction Management, Architecture, or an equivalent degree or certification, and/or equivalent related work experience in data management is also specified. Experience on industrial or high-tech semiconductor manufacturing projects is preferred. The position requires experience with scheduling and project management tools, technical data organization, construction documentation, and low-voltage electrical construction. The Scheduler must communicate effectively, collaborate across teams, manage complex data and competing priorities, and maintain professionalism in high-pressure situations. The work schedule must be flexible to accommodate extended hours or off-shift work when construction schedules and sequences change. Physical work includes a combination of standing, walking, and sitting, occasional stair climbing, and lifting or carrying up to 20 pounds. The stated salary range is $95,000–$125,000, plus incentives.

Requirements

  • At least two years of construction project scheduling experience using Primavera P6.
  • High school diploma or GED.
  • A bachelor’s degree in Civil Engineering, Construction Management, Architecture, or an equivalent degree or certification, and/or equivalent related work experience in data management.
  • Educational background in materials and methods of construction.
  • Experience with project management software such as Primavera Project Planner (P6), Procore, Bluebeam, and Microsoft Project.
  • Proficiency with Windows and Microsoft Office 365, including Excel, Word, Outlook, PowerPoint, and Teams, and a general understanding of computer networks.
  • Experience organizing technical data neatly and accurately.
  • Thorough understanding of all aspects of low-voltage electrical construction.
  • Highly developed visual observation and interpretation skills.
  • Ability to work well and maintain a cooperative attitude in high-pressure situations.
  • Excellent time-management skills and ability to multitask and prioritize while frequently interrupted.
  • Excellent written and oral communication skills and ability to develop strong interpersonal relationships.
  • Ability to work closely with trade and craft workers in a field-work situation.
  • Patience, professionalism, and strong teamwork and collaboration skills across departments and levels of leadership.
  • Flexible work schedule to accommodate extended hours or off-shift work as construction schedules and sequences change.
  • Ability to make sense of complex, high-volume data and investigate root causes.
  • Ability to manage setbacks and adversity, collaborate toward shared objectives, build trust, and ensure accountability.
  • Ability to work independently, make decisions, and follow through on assignments.
  • Creativity, independent judgment, organizational and problem-solving skills, and the ability to plan and organize work.
  • Strong organizational and computer-use skills, and competency in reading, writing, and speaking English, interpreting construction-related documentation, and communicating with coworkers.
  • Ability to stand, walk, and sit during the workday; climb stairs for approximately 5% of the day; use a mouse, keyboard, and computer constantly; and lift or carry up to 20 pounds.
  • Visual acuity at near, mid, and far ranges, including color and peripheral vision, depth perception, and hand-eye coordination; hearing sufficient for conversation in person and over the telephone; and speech sufficient to communicate in person, address groups, and be understood over the telephone.
  • Ability to perform minimal bending, twisting, kneeling, crouching, and crawling; computer and drawing work is minimal.
  • Constant mental alertness, accuracy, and attention to detail.

Nice To Haves

  • Specific experience on industrial and/or high-tech semiconductor manufacturing projects.
  • Experience with design software such as AutoCAD, Revit, and Navisworks.
  • Training in design and construction document reading, design specifications, survey theory, and techniques.
  • Familiarity with the CSI specification system for construction.

Responsibilities

  • Collect and enter schedule status updates into the project record schedule.
  • Attend project schedule progress meetings as needed.
  • Identify changes to the project schedule.
  • Notify teams about impacts to critical-path activities and/or schedule logic.
  • Maintain technical integrity of project schedules.
  • Produce and distribute weekly and monthly schedules, forecasts, and reports.
  • Manage Outlook distribution lists and standard-form emails for schedule distribution.
  • Maintain project schedule archives and documentation.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service