Project Solutions Inc. is seeking an experienced Construction Management Representative for two concurrent projects at the North Rim of Grand Canyon National Park. These projects involve restoring critical wastewater, potable water, and electrical utility systems damaged by the 2025 Dragon Bravo Fire, and installing a temporary wastewater treatment plant to support the park's reopening and operations. This role is contingent upon award of project and is for a period of performance of 258 calendar days, roughly from August 2026 through July 2027, with a winter shutdown/exclusion period from December 2026 through March 2027.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
No Education Listed