This position will place the front halves on debone cones. Front halves will be transferred from the collection bins to cones at the beginning of the debone line. Successful trainees will correctly place a front half on each cone, without missing, dropping front halves, damaging ribs, or splitting the keel bones. All Tyson Team Members are responsible for safety. This includes but is not limited to personal and food safety.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
No Education Listed