ProSidian Seeks a Combo Certified Safety Professional (CSP)/Certified Industrial Hygienist (CIH) - Construction/Industrial Hygiene (CO109/IH104) Engagement Team | 1099 Contractor - Labor Hour Subcontract located Savannah River Site / Aiken, South Carolina supporting a liquid waste contractor (Savannah River Remediation [SRMC]) at the Savannah River Site in Aiken, SC, which is owned by the U.S. Department of Energy. Seeking Combo Certified Safety Professional (CSP)/Certified Industrial Hygienist (CIH) candidates (Labor Category: Health and Safety Specialist) at Savannah River Site / Aiken, South Carolina. This is a Labor Hour Subcontract or Contract W-2 (IRS-1099) Position, and ProSidian reserves the right to convert it to a Full-Time ProSidian employed W-2 Position. JOB OVERVIEW: Provide services and support as a Combo Certified Safety Professional (CSP)/Certified Industrial Hygienist (CIH) (CO109/IH104) at Savannah River Site / Aiken, South Carolina. The Scope Of Work includes SDU10-12 Interior Protective Covering(s) and Height Marking, which entails the installation of a liner to interior concrete surfaces of Saltstone Disposal Units (SDUs) 10, 11, and 12 at the Savannah River Site Facility Code(s): SS/SALTSTONE. Each structure has an average inside diameter of 375 feet and a height of 43 feet. Each contains 208 roof support columns that are 2 feet in diameter. The protective covering(s) shall perform two (2) primary functions: 1) structure leak tightness and 2) chemical protection. A Leak Tight Liner System (LTLS) shall be used to achieve leak tightness within the SDU structure. The installed LTLS shall withstand an approximately 43-foot hydrostatic leak test using a dye tracer with zero leakage (leak-tight structure). The Liquid Waste Contractor (LWC) will perform the required leak testing. LTLS shall cover all concrete surfaces that form the liquid containment boundary, including floor, floor-to-column-transition, floor/wall joint, wall, and the bottom 6 inches (minimum) of roof support columns. Embed plates shall be coated with Chemical Resistant Coating System (CRCS) where LTLS is absent. Background: The Saltstone Facility at the Savannah River Site (SRS) disposes of low-level radioactive salt solution from liquid waste processing facilities. The Saltstone Facility immobilizes low-level radioactive salt solution waste by mixing it with a dry material mixture of fly ash, slag, and possibly cement to produce a flowable grout mixture. This grout is poured into large concrete disposal units where it cures to become Saltstone, a non-hazardous material, for permanent disposal. These large concrete disposal units are called SDUs. Together, the CSP and CIH roles ensure comprehensive management of safety and industrial hygiene at the Saltstone Facility at the Savannah River Site (SRS), supporting the safe and compliant execution of the contract.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Career Level
Senior