BESS Lead Engineer, Power Generation

Fluidstack•Austin, TX
•$263,000 - $330,000

About The Position

Fluidstack is building civilization-scale infrastructure for AI, focusing on delivering 10 to 100s of GWs of compute faster than anyone else. This involves acquiring power, designing and building data centers, and operating them. The Energy Team is responsible for deploying solar, storage, and gas generation at an unprecedented install rate, securing supply chains, and ensuring power stability for AI workloads. The team also handles crucial certifications, permits, and interconnections. This role is focused on owning the electrical design and sizing of multi-hundred-megawatt storage plants, qualifying BESS vendors, defining dispatch strategies for hybrid plants, driving safety compliance, and managing the commissioning process.

Requirements

  • Taken grid-scale battery storage from single line to energized plant, and can name the sites and the megawatts.
  • Sized a storage system against a real duty cycle and lived with the result, including the augmentation call and the places the model turned out to be wrong.
  • Chosen between BESS vendors on technical grounds, sat through factory witness testing, and pushed back on a datasheet that did not survive scrutiny.
  • Argued NFPA 855 and hazard mitigation analysis in front of an AHJ or an insurer and got to approval.
  • Integrated storage controls with generation and load so the combined plant behaves as one machine rather than three.
  • Write clearly enough that a procurement lead, a fire marshal and a CEO each get the decision they need out of the same document.

Nice To Haves

  • Hybrid plant and dispatch modelling (PLEXOS, PVsyst, HOMER).
  • Power system studies (PSPSCAD, ETAP, protection coordination, arc flash).
  • Behind-the-meter and islanded microgrid operation.
  • Interconnection and market processes (FERC, ERCOT, MISO).
  • Professional Engineer license.

Responsibilities

  • Own the electrical design and sizing of multi-hundred-megawatt storage plants, from single line, protection and grounding through power and energy ratings and augmentation strategy, across several concurrent gigawatt sites.
  • Qualify and dual-source BESS vendors on technical merit, running factory witness testing, failure mode review and warranty terms alongside supply chain.
  • Define how storage, solar and on-site generation dispatch together so the plant holds a firm load profile through resource swings and generator trips.
  • Drive NFPA 855 compliance, hazard mitigation analysis and large-scale fire test evidence through the AHJ and the insurer before equipment reaches site.
  • Take each plant through commissioning, capacity and round-trip performance testing and controls integration before the first training load connects.

Benefits

  • pay equity and transparency
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service